At peak, 2 agents were mid-tool-call in the same second. One run, one job - and a headcount no single-agent tool can log. 89 agents were hired across 1 hours. A dedicated supervision lane spent 122 model calls doing nothing but checkups on the rest of the team.

Where this happened.

Source events.

Detected mechanically by the impossible_scale detector from 2 telemetry event(s):

  • a8ac6f07-7262-459d-b17c-63f67a4caf3c
  • a0af7fd9-9a29-4714-9512-04be138d7bfb